skip to Main Content

Regional FERC Order 841 Implementations

In our previous blog post, introductory information about the Federal Energy Regulatory Commission (FERC) Order 841 was addressed. This article describes the key features of how each region has preliminarily proposed to implement Order 841.
Read more

Energy Storage on the Move: An Introduction to FERC Order 841

On February 15, 2018, the Federal Energy Regulatory Commission (FERC) issued Order 841, which is designed to remove barriers to the participation of electric storage resources in the capacity, energy, and ancillary services markets operated by Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs).
Read more

Dairyland Power Cooperative Selects SettleCore for Shadow Settlements in MISO

Dairyland Power Cooperative (DPC), consisting of 25 member systems with a total peak load in excess of 1,000 MW and generation capacity in excess of 1,300 MW has implemented the Power Settlements shadow settlement system to perform shadow settlement estimates and validations of their MISO market settlement charge types. After a rigorous testing period, Dairyland moved SettleCore™

Read more

City Water Light and Power Implements SettleCore for MISO

City Water Light and Power (“CWLP”), the largest municipal utility in Illinois, recently implemented the SettleCore™ – ISO Downloader Module for their reporting needs in the MISO markets.

“We are excited to bring CWLP on board as a new customer of ours in the MISO footprint. The ability of SettleCore™ to download 100% of the MISO data, the open database of the system, the ability to easily view data in the pivot-table based screens, and the ability to export all MISO data to MS Excel, are key benefits to CWLP,” said David Dan, CEO of Power Settlements.

Read more

Entegra Power Group Implements SettleCore for MISO from Bid to Bill

Entegra Power Group, new to MISO South, owns and operates some of the largest independent power plants in the United States, including the Arkansas Union Power Station, which produces close to 2,200 MW of power in the MISO market.

After reviewing Power Settlements and several competing software vendors, Entegra selected SettleCore™ for all of their interactions and communications in the MISO market. Entegra and Power Settlements recently completed the SettleCore™ implementation for all of their bid to bill interactions in MISO.

Read more

Entegra Power Group Selects SettleCore for Scheduling and Settlements in MISO and PJM

Entegra Power Group has selected the SettleCore system for all of their scheduling, outage management, meter uploads, shadow settlements, invoicing, reporting, and Business Intelligence needs in the MISO market. SettleCore has already been installed and is currently being used by Entegra in the MISO market trials, as their Union Power Station has been transferred to the MISO balancing authority as part of Entergy’s move into the MISO.

Read more
Back To Top
Search
Real Time Analytics