skip to Main Content

Regional FERC Order 841 Implementations

In our previous blog post, introductory information about the Federal Energy Regulatory Commission (FERC) Order 841 was addressed. This article describes the key features of how each region has preliminarily proposed to implement Order 841.
Read more

Energy Storage on the Move: An Introduction to FERC Order 841

On February 15, 2018, the Federal Energy Regulatory Commission (FERC) issued Order 841, which is designed to remove barriers to the participation of electric storage resources in the capacity, energy, and ancillary services markets operated by Regional Transmission Organizations (RTOs) and Independent System Operators (ISOs).
Read more

SettleCore Implemented by Entegra Power Group for PJM

Power Settlements is pleased to announce that Entegra Power Group recently implemented SettleCore for their bid to bill participation in PJM. SettleCore enables the automated upload of bids and offers to the ISOs through shadow settlements and reporting. Entegra is an active participant in the ISO markets and uses SettleCore for their interaction in CAISO, MISO, and PJM.

Read more

Entegra Power Group Selects SettleCore for Scheduling and Settlements in MISO and PJM

Entegra Power Group has selected the SettleCore system for all of their scheduling, outage management, meter uploads, shadow settlements, invoicing, reporting, and Business Intelligence needs in the MISO market. SettleCore has already been installed and is currently being used by Entegra in the MISO market trials, as their Union Power Station has been transferred to the MISO balancing authority as part of Entergy’s move into the MISO.

Read more
Back To Top
Search
Real Time Analytics