skip to Main Content

San Francisco has Successful Go-Live of the Power Settlements Energy Trading and Scheduling Solution with CAISO Integration and Settlements

San Francisco Public Utilities Commission (“SFPUC”), the City of San Francisco, CA’s municipal power utility that provides for municipal city loads and owns and operates the 400 MW Hetch Hetchy hydroelectric system, has successfully implemented the Power Settlements SettleCore™ solution for their Energy Trading and Risk Management (ETRM) and ISO needs.

Read More

Dairyland Power Cooperative Selects SettleCore for Shadow Settlements in MISO

Dairyland Power Cooperative (DPC), consisting of 25 member systems with a total peak load in excess of 1,000 MW and generation capacity in excess of 1,300 MW has implemented the Power Settlements shadow settlement system to perform shadow settlement estimates and validations of their MISO market settlement charge types. After a rigorous testing period, Dairyland moved SettleCore™

Read More

Happy One Year Anniversary City of Pasadena. An ETRM Success Story.

When the City of Pasadena selected SettleCore™ ETRM over a year ago they required an energy trading and risk management (“ETRM”) system to be fully integrated with their Bid-to-Bill shadow settlements system. Their story was a common one among their utility industry peers. They were looking for a vendor that had one single system that encompassed all of their ETRM needs and their Bid-to-Bill needs

Read More

SettleCore Implemented by Entegra Power Group for PJM

Power Settlements is pleased to announce that Entegra Power Group recently implemented SettleCore for their bid to bill participation in PJM. SettleCore enables the automated upload of bids and offers to the ISOs through shadow settlements and reporting. Entegra is an active participant in the ISO markets and uses SettleCore for their interaction in CAISO, MISO, and PJM.

Read More
Back To Top
Search
Real Time Analytics